MnDOT staff report
Latest Articles:
Highway 61 Grand Marais construction begins May 6
MnDOT staff report | May 07, 2021
Construction is expected to resume on Highway 61 in Grand Marais on May 6. Initial work will be occurring from 3rd Avenue West to Broadway and 8th Avenue West to 3rd Avenue West on the lake side or south side of the highway. Starting May 6, the truck detour will begin with through truck traffic being routed on County Road... READ MORE >
MnDOT advances more than 200 road projects during 2020 construction season
MnDOT staff report | November 13, 2020
The Minnesota Department of Transportation advanced or completed more than 200 road and bridge projects during the 2020 construction season that is now wrapping up throughout Minnesota. An additional 36 projects enhanced safety at railroad crossings, and 15 projects extended or repaired runways or other infrastructure at local airports. “Minnesota’s 2020 construction program represented a broad mix of projects that... READ MORE >
MnDOT installing sinusoidal rumble strips along Highway 61
MnDOT staff report | August 23, 2019
The Minnesota Department of Transportation (MnDOT) began installing sinusoidal rumble strips at various locations along Highway 61 beginning Monday, Aug. 19. The sections of highway where sinusoidal rumble strips will be installed this year include from mile posts 46 to 50 south of Silver Bay, mile posts 77 to 78 south of Schroeder, mile posts 100 to 106 south of... READ MORE >
Highway 61 pavement planing project begins April 29
MnDOT staff report | May 03, 2019
A pavement planing project was scheduled to begin Monday, April 29 on Highway 61 in St. Louis County. The area being planed stretches from the Crow Creek to the Gooseberry River. Motorists will encounter lane closures, Mondays through Thursdays in the areas where the work is taking place. There will be no lane closures on Fridays, Saturdays or Sundays. The... READ MORE >
MnDOT sees $7 million benefit from Adopt a Highway volunteers in 2018
MnDOT staff report | April 19, 2019
Volunteers helping with the Adopt a Highway program picked up nearly 36,000 bags of litter and cleaned up almost 9,000 miles of state roadways in 2018, according to the Minnesota Department of Transportation. More than 3,500 volunteer groups, ranging from four to 25 people, spent an estimated 282,000 hours cleaning roadway ditches across Minnesota last year, which translated into an... READ MORE >